
- This event has passed.
Osler Storm System – Wet/Dry Pond
September 19, 2017 @ 12:00 pm - 1:00 pm UTC-6
Presentation Summary:
The Town of Osler has historically faced challenges with regards to storm water management, as storm water drains primarily via overland drainage and the Town has very little elevation change to facilitate efficient drainage. In 2016, a wet/dry pond, storm water pumping station, and storm sewer system were installed to provide better storm water management opportunities. This presentation will review the system installed in 2016, as well as the system extensions currently under construction.
Speaker:
Ehren Gadzella has been a full-time Project Engineer at Catterall & Wright Consulting for three years. She graduated from the College of Engineering at the University of Saskatchewan in 2014, and has been gaining experience working on a range of municipal projects in field and office roles since then. She has also been an active member of the CSCE Saskatoon Section Executive, serving as the chair for the 2016-2017 season.
Looking forward to see you there!
CSCE Executive Team
FAQs
What are my parking options for the event?
Parking is FREE during our event. When you arrive at the Park Town Hotel, skip the parking payment machine and go to the front desk to let them know that you are attending the CSCE Saskatoon Section Nooner.
Is my registration/ticket transferable?
Yes, it is. You can give your ticket to a friend or colleague.
Do I have to bring a copy of my ticket to the event?
While not absolutely necessary, it does help us check our guests in faster if you bring either a paper copy of your ticket or download it to your smart phone.